Activities

Prior to the implementation of the development plan, the pilot plot contained only about 20, non-irrigated, poorly maintained, and hardly productive olive trees.

The pilot plot is located nearby a surface well equipped with an electric pump station that can produce about 50 m3 per day. The total salinity of the well water is about 4.146 g/l.

The implementation of the Action Plan followed the instruction of the approach adopted by the SASS III project. Like all the other pilots, pilot 6 Action Plan, it is structured around four axes: institutional axis, technical axis, monitoring-evaluation axis, and informational axis.

The main activities conducted under pilot6 include:

  • mobilisation of local partners;
  • elaboration of a plot plan with an appropriate crop rotation;
  • development activities conducted on the pilot plot;
  • acquisition of two greenhouses, small tunnels for protected field crops and a localized irrigation system;
  • acquisition and installation of a desalination station;
  • construction of a storage basin for the desalinated water and another basin for the mixed irrigation water;
  • acquisition and installation of an electric water pump to distribute irrigation water and put it under pressure;
  • acquisition of  seeds, plants, and agricultural inputs;
  • crops cultivation;
  • technical fellow-up of agricultural practices by the local monitoring committee under the supervision of the director general of the CRDA (Commisariat Régional du Développement Agricole) and OSS;
  • Results dissemination by conducting field visits and holding workshops. 

 

anadolu yakası escort

bursa escort görükle escort bayan

bursa escort görükle escort

güvenilir bahis siteleri canlı bahis siteleri kaçak iddaa siteleri kaçak iddaa kaçak bahis siteleri perabet

görükle escort bursa eskort bayanlar bursa eskort bursa vip escort bursa elit escort escort vip escort alanya escort bayan antalya escort bayan bodrum escort

alanya transfer
alanya transfer
bursa kanalizasyon açma